Public Safety Building

Coming Together, Brick by Brick

The exterior brick is completed around the perimeter of the building and the roof systems should be dried in and 80% complete, making the inside more manageable to work in when a storm rolls through on a whim. The parking lot waterways, curb, and gutter are starting to develop in preparation for asphalt before it gets too cold. We’ll be seeing cooler temps before too long!

Leave a Reply